[1]
M. N. Graceae, E. Rianti, and H. Kurnia, “Information System Design and Application of the Critical Path Method (CPM) Determining the Optimal Time for Implementing Activities”, jcsitech, vol. 10, no. 3, pp. 88–92, Jul. 2024.